| ALCO
INVESTMENTS FORUM FLOOR |
What the Pros Say ...
Case Study
¨C
Bay-to-Breakers Application Period ¨C Seven days. Coverage ¨C 80,000 square feet. Weight / Force Levels ¨C Moderate impact supporting concession operations, cooking equipment and supplies. Results ¨C After a seven-day coverage, the sod was healthiest in the areas covered by the product. Residual Effects ¨C After heavy use, Forum Floor® imprints a ridge-like pattern in the grass ¨C but only in the grass. Even in areas with the highest force impact, the sod was undamaged. After a few days of normal care the indented areas of grass lifted and the surface was again level. Comparison / Contrast ¨C The drier appearance of the areas not covered by Forum Floor® is attributable to the inability to water from event setup to event breakdown. The perforated Forum Floor® allowed the covered areas of sod to breath and get sun while retaining dew accumulated in the mornings of the four-day installation. |
|
¡¡
|
Home l Contact l Forum Floor Case Studies
Copyright © 2001 - 2008 / Website Writer